Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />SECTION 13904 <br />PIPE ANCHORS <br />A. The Contractor shall furnish all labor, equipment, materials, and <br />incidentals necessary for the fabrication and installation of the pipe <br />anchors as shown in the drawings and specified herein. <br />B. Submittals shall be in accordance with the pertinent provisions of Section <br />01300. <br />2.01 MATERIALS <br />A. Pipe anchors shall be fabricated or manufactured by ITT Grinnell, <br />Rockwell, or Unistrut, or approved equal. <br />B. The Contractor shall provide concrete footings. <br />C. Pipe anchors shall be arranged to prevent excessive deflection, and to <br />avoid excessive bending stress. <br />PART 3 EXECUTION <br />3.01 INSTALLATION <br />A. Pipes shall be adequately supported to maintain alignment and to prevent <br />sagging or movement of the pipe. Adequate provisions shall be made to <br />prevent shearing and twisting of the pipe and the joints. Adequate <br />provisions shall be made to the pipe anchors to reduce upward or lateral <br />pipe movement. <br />B. The Contractor shall provide all other materials not specifically described <br />herein but may be required for a complete and proper installation. <br />North County IXG Collection System <br />San Joaquin County Public Works <br />1 <br />PIPE ANCHORS <br />Section 13904 <br />