My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />SECTION 13904 <br />PIPE ANCHORS <br />A. The Contractor shall furnish all labor, equipment, materials, and <br />incidentals necessary for the fabrication and installation of the pipe <br />anchors as shown in the drawings and specified herein. <br />B. Submittals shall be in accordance with the pertinent provisions of Section <br />01300. <br />2.01 MATERIALS <br />A. Pipe anchors shall be fabricated or manufactured by ITT Grinnell, <br />Rockwell, or Unistrut, or approved equal. <br />B. The Contractor shall provide concrete footings. <br />C. Pipe anchors shall be arranged to prevent excessive deflection, and to <br />avoid excessive bending stress. <br />PART 3 EXECUTION <br />3.01 INSTALLATION <br />A. Pipes shall be adequately supported to maintain alignment and to prevent <br />sagging or movement of the pipe. Adequate provisions shall be made to <br />prevent shearing and twisting of the pipe and the joints. Adequate <br />provisions shall be made to the pipe anchors to reduce upward or lateral <br />pipe movement. <br />B. The Contractor shall provide all other materials not specifically described <br />herein but may be required for a complete and proper installation. <br />North County IXG Collection System <br />San Joaquin County Public Works <br />1 <br />PIPE ANCHORS <br />Section 13904 <br />
The URL can be used to link to this page
Your browser does not support the video tag.