3.10 FIELD QUALITY CONTROL <br />A. Verify electrical load between phases on panel boards and motor starter panels after <br />installation. <br />B. Voltage Testing: <br />1. When installation is complete and facility is in operation, check voltage at point <br />of termination of electric feeders to motor assemblies. <br />2. Check voltage amplitude and balance between phases for loaded and unloaded <br />conditions. <br />C. Equipment Line Current: Check line current in each phase for each piece of <br />equipment. <br />3.11 PROTECTION FOLLOWING INSTALLATION <br />A. Protect materials and equipment from corrosion, physical damage, and the effects of <br />moisture on insulation. <br />B. Cap conduit runs during construction with manufactured seals. <br />C. Close openings in boxes or equipment during construction. <br />Energize space heaters furnished with equipment. <br />3.12 SENSORS <br />A. Contractor shall install sensors with sufficient conduit such that the sensor can be <br />removed without disconnecting the wiring. <br />4MEBTUI' . 1. Ul \y <br />A. Separate measurement for payment will not be made for work or materials specified <br />in this Section. <br />4.02 PAYMENT <br />A. Separate payment will not be made for work or materials specified in this Section. <br />Full compensation shall be considered as included in the prices paid for the flare <br />station construction, and no additional compensation will be allowed or paid. <br />North County LFG Collection System <br />San Joaquin County Public Works <br />I�717 �F.��7111 C17 <br />20 <br />R ARE STATION ELECTRICAL <br />Section 16005 <br />