Laserfiche WebLink
n <br />0 <br />0 <br />C <br />u <br />n <br />n <br />i <br />0 <br />u <br />7 <br />7 <br />PART 3 EXECUTION <br />A. Work which has been rejected shall be remedied, or removed and replaced, <br />by the Contractor at his own expense, with work conforming to the Plans <br />and Specifications. Latent defects which become apparent before lapse of <br />the warranty period shall be corrected by Contractor at its sole cost and <br />expense provided Owner notifies Contractor of such defect within six (6) <br />months after discovery thereof by Owner. Failure to inspect work at any <br />stage shall not relieve the Contractor from an obligation to perform sound <br />and reliable work as herein described. It is the Contractor's ultimate <br />responsibility to deliver at the time of final acceptance a complete project <br />that complies in all details with these Plans and Specifications. All items <br />should be ready to operate. <br />B. The Engineer will endeavor to identify errors or defective materials and <br />workmanship and call them to the attention of the Contractor prior to <br />subsequent work being performed. However, the Engineer is under no <br />obligation to do so, and neither the Owner nor the Engineer shall be held <br />liable if errors or defective material or workmanship by the Contractor are <br />not discovered by the Engineer prior to acceptance of work. Any failure <br />on the part of the Engineer to discover, or notify the Contractor of, or to <br />condemn defective work or material at the time of construction shall not <br />be deemed an acceptance, and the Contractor will be required to correct <br />defective work or material prior to final acceptance at his expense. <br />C. During the warranty period, if the Contractor fails to remedy defective <br />material or workmanship, or to make replacements within five (5) work <br />days after written notice by the Owner, it is agreed that the Owner may <br />(but is not bound to) make such repairs and replacements and the actual <br />cost of the required labor and materials shall be chargeable to and payable <br />by the Contractor. <br />D. In the event that immediate repairs are required by a regulatory agency due <br />to system failure caused by or due to defective material or workmanship, <br />repairs and or replacements may be made by Owner if Contractor does not <br />respond upon notification or cannot be contacted. The actual cost of the <br />required labor and materials shall be chargeable to and payable by the <br />Contractor. <br />North County LFG Collection System 2 <br />San Joaquin County Public Works <br />CONTROL OF WORK <br />Section 01742 <br />