My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.08 TESTING <br />A. Compaction shall be established by the compaction test procedures prescribed in <br />ASTM Designation D-1557. <br />B. Soils testing shall be performed by an independent accredited testing laboratory <br />employed by the County at the County's expense or the County's test laboratory. <br />C. The Contractor is to cooperate with the soil laboratory in allowing tests and <br />following recommendations as to whether areas have or have not met earthwork <br />criteria acceptable to the County. <br />D. If compaction or moisture testing fails, retesting will be performed by the County <br />at the Contractor's expense. <br />PART 4 MEASUREMENT AND PAYMENT <br />4.01 MEASUREMENT <br />A. Trenching in Native Soil: Measurement for payment for excavation and backfill <br />of the trenches in native soil shall be measured in terms of linear feet regardless of <br />trench depth. <br />B. Trenching in Refuse: Measurement for payment for excavation and backfill of the <br />pipe trenches in refuse shall be measured in terms of linear feet regardless of <br />trench depth. <br />C. Construction of Berm Crossings: Measurement for payment for the berm <br />crossings shall be paid for at the contract unit price for actual units installed. <br />4.02 PAYMENT <br />A. Trenching in Native Soil: Payment shall be made at the contract unit price per <br />linear foot for Trenching in Native Soil as identified in the proposal. Payment <br />shall be made for approved quantity excavated and backfilled including sheeting, <br />shoring, trench safety measures, bracing, sand bedding, hauling and disposal of <br />excess excavation material and compaction as shown on the drawings. No <br />payments shall be made for quantities determined to be over -excavated. Payment <br />shall be made to the nearest two -foot station. Payment shall be full compensation <br />for labor, materials, tools, equipment, overhead, and other work and incidentals <br />necessary to complete the work of this section. Unless authorized by the Owner, <br />the quantity paid shall not exceed the amount shown on the proposal for <br />Trenching in Native Soil. <br />North County LFG Collection System 6 TRENCHING AND EXCAVATION <br />San Joaquin County Public Works Section 02225 <br />
The URL can be used to link to this page
Your browser does not support the video tag.