Laserfiche WebLink
C <br />� I <br />I I <br />n <br />C <br />F <br />C <br />u <br />u <br />u <br />I <br />B. Trenching in Refuse: Payment shall be made at the contract unit price per linear <br />foot for Trenching in Refuse as identified in the proposal. Payment shall be made <br />for actual quantity excavated and backfilled including sheeting, shoring, trench <br />safety measures, bracing, sand bedding, hauling of refuse to the open face, and <br />disposal of excess excavation material and compaction as shown on the drawings. <br />No payments shall be made for quantities determined to be over -excavated. <br />Payment shall be made to the nearest two -foot station. The bidder is required to <br />provide a unit price. Payment shall be full compensation for labor, materials, <br />tools, equipment, overhead, and other work and incidentals necessary to complete <br />the work of this section. Unless authorized by the Owner, the quantity paid shall <br />not exceed the amount shown on the proposal for Trenching in Refuse Soil. <br />C. Construct Berm Crossing: Payment for construction of Berm Crossing shall be on <br />the basis of unit price per Berm Crossing installed as identified in the proposal. <br />Payment shall include all earth work, excavation, fittings and bentonite shown on <br />the plans. Payment shall be full compensation for Iabor, materials, tools, <br />equipment, overhead, and other work and incidentals necessary to complete the <br />work of this section. Unless authorized by the Owner, the quantity paid shall not <br />exceed the amount shown on the proposal for Construct Berm Crossing. <br />North County LFG Collection System 7 TRENCHING AND EXCAVATION <br />San Joaquin County Public Works Section 02225 <br />