My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />� I <br />I I <br />n <br />C <br />F <br />C <br />u <br />u <br />u <br />I <br />B. Trenching in Refuse: Payment shall be made at the contract unit price per linear <br />foot for Trenching in Refuse as identified in the proposal. Payment shall be made <br />for actual quantity excavated and backfilled including sheeting, shoring, trench <br />safety measures, bracing, sand bedding, hauling of refuse to the open face, and <br />disposal of excess excavation material and compaction as shown on the drawings. <br />No payments shall be made for quantities determined to be over -excavated. <br />Payment shall be made to the nearest two -foot station. The bidder is required to <br />provide a unit price. Payment shall be full compensation for labor, materials, <br />tools, equipment, overhead, and other work and incidentals necessary to complete <br />the work of this section. Unless authorized by the Owner, the quantity paid shall <br />not exceed the amount shown on the proposal for Trenching in Refuse Soil. <br />C. Construct Berm Crossing: Payment for construction of Berm Crossing shall be on <br />the basis of unit price per Berm Crossing installed as identified in the proposal. <br />Payment shall include all earth work, excavation, fittings and bentonite shown on <br />the plans. Payment shall be full compensation for Iabor, materials, tools, <br />equipment, overhead, and other work and incidentals necessary to complete the <br />work of this section. Unless authorized by the Owner, the quantity paid shall not <br />exceed the amount shown on the proposal for Construct Berm Crossing. <br />North County LFG Collection System 7 TRENCHING AND EXCAVATION <br />San Joaquin County Public Works Section 02225 <br />
The URL can be used to link to this page
Your browser does not support the video tag.