My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />0 <br />0 <br />0 <br />n <br />G <br />L <br />L <br />B. Concrete reinforcements shall conform accurately to the dimensions and <br />details as shown on the Drawings or otherwise specified. <br />PART 2 MATERIALS <br />A. Materials used in concrete shall conform to Section 90 of the Standard <br />Specifications. <br />A. Reinforcements shall conform with Section 52 of the Standard Specifications. <br />r t • � � � • Ess t <br />A. Concrete curing compound shall be used and shall meet Federal Specifica- <br />tion TT -C-800, Type I, Class 1 non yellowing with minimum 18 percent <br />solids and a maximum unit moisture loss of 0.039 gm/cm2. Manufacturer <br />shall be Gifford -Hill "Sealco 800," ProSoCo "Kure and Seal," Protex <br />"Acrychlor," Sonneborn "Kure -N -Seal' or approved equal. <br />B. Alternatively, the Contractor may use a 6 mil. polyethylene film for <br />protection during curing and cure with water method. Water method <br />includes covering concrete with plastic film and applying water under the <br />plastic daily for two weeks. <br />2.04 STRENGTH AND SLUMP <br />A. The minimum concrete compressive strength shall be 2500 psi unless <br />otherwise specified. The slump shall not exceed 4 inches at the time it is <br />being placed in conformance with ASTM C 150. <br />PART 3 EXECUTION <br />3.01 PREPARATION <br />A. The Contractor shall install forms that produce hardened concrete having <br />the shape, lines, and dimensions indicated on the Drawings. Forms shall <br />be strong and sufficiently tight to prevent Ieakage and shall be maintained <br />in proper position and accurate alignment. Forms shall be thoroughly <br />cleaned and oiled before concrete is placed. <br />North County LFG Collection System 2 CONCRETE <br />1 San Joaquin County Public Works Section 03302 <br />
The URL can be used to link to this page
Your browser does not support the video tag.