My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Wash Water <br />Contain wash water contaminated with cement. Such wash water may be spread on road areas <br />within the landfill sites as identified by the Landfill Site supervisor. <br />Contractor shall distribute cuttings in the general vicinity of the boring, conforming to the <br />approximate contours prior to the work. <br />1.05 ADDITIONAL WORK <br />Attention is directed to Sections 4-1.03, "Changes," and 9-1.03, "Force Account Payment," of the <br />Standard Specifications and these special provisions. <br />The contract item "force account" shall be work not included in the unit prices, as directed by the <br />Engineer. Contractor shall obtain written authorization for any such work. <br />If a directive by the Engineer, whether written or verbal, seems to the Contractor to be a change <br />of contract scope, the Contractor shall immediately call the Engineer's attention to that <br />interpretation. Failure of the Contractor to call the attention of the Engineer to such a directive is <br />acceptance by the Contractor of that directive as a contract change at no additional cost and at <br />no additional contract time. <br />PART 2 - MATERIALS <br />2.01 SUBMITTALS <br />When a manufacturer of an item is identified, the Contractor may install that item from that <br />manufacturer without submittal. <br />The Contractor shall submit information on parts or materials that differ from that identified in this <br />contract. Contractor shall submit a minimum three (3) copies of the submittal; the Engineer will <br />retain two copies, returning the remainder to the Contractor. <br />Submittals shall be dated and clearly indicate the item proposed for substitution. <br />All submittals shall be made to the Engineer. Allow five working days for review of the submittal <br />by the Engineer. <br />Contractor shall not install the item in question until the submittal has been accepted by the <br />Engineer. <br />2.02 PROPS PIPE AND FITTINGS <br />A. Probe Valve <br />Probe pipe valve shall be a Stopcock Valve, comprised of polyvinyl chloride (PVC), <br />brass or stainless steel. Probe valve shall be provided with hose barb X male pipe <br />thread fittings. <br />Single Probe <br />LFG Migration Monitoring Well Specifications 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.