My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Uncompleted Borings: <br />1. Provide secure, vandal -proof covers and apply safety precautions for all <br />uncompleted borings. <br />2. Measure and record depth of uncompleted borings left overnight prior to <br />commencement of drilling on the next day. Re -drill collapsed borings at no <br />additional cost to the County. <br />J. Abandoned Borings <br />1. If impenetrable obstructions are encountered during drilling, the Contractor <br />shall cease drilling and promptly notify the Engineer. The Engineer will <br />determine whether to abandon or to complete the well to the specified <br />depth. <br />2. Borings not completed as soil gas wells shall be backfilled with neat <br />cement as soon as possible. <br />3.04 PROBE PIPE ASSEMBLY <br />A. Probe pipe shall have no joints. <br />B. Cover top end of probe pipe to prevent materials getting in. The cover shall last <br />throughout well installation process. <br />C. Verify the dimension of the perforated section of the probe pipe with the Engineer <br />D. Drill perforation holes on the probe pipe per the construction drawings. <br />3.05 WELL INSTALLATION <br />A. Well installations shall be inspected with EHD inspector. <br />B. Contractor shall place items specified in the construction drawings and in these <br />specifications in the presence of the EHD inspector. <br />C. Any boring that collapses during well installation shall be re -drilled to the specified <br />depth at no additional cost to the County. <br />D. Backfilling <br />1 Measure the depth of the well drilled from surrounding grade in the <br />presence of the Engineer and EHD inspector before backfilling. <br />2 Do not allow any organic materials into the borehole. <br />3 Place backfill materials to avoid bridging, overfilling the boring, or <br />damaging the probe pipes. <br />Single Probe <br />LFG Migration Monitoring Well Specifications 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.