Laserfiche WebLink
Page 2 of 2 <br />unlikely. <br />As you know, we are required to monitor the perimeter wells quarterly, and that the second <br />quarter of this year extends through June. Successful monitoring in June would fulfill the <br />requirements of the Regs. I have no doubt that this probe will clear before then. <br />We will also install two shallow wells to ensure we are able to monitor the shallow stratum next <br />winter without difficulty. However, the conditions that cause water to be in the shallow probe also <br />prevent us from installing those two shallow wells. <br />I hope this information is useful. Please call with any questions. <br />Best regards, <br />Mike Carroll <br />W. Michael Carroll, PE <br />Senior Civil Engineer, Solid Waste Division <br />1810 E. Hazelton Ave. <br />Stockton, CA 95205 <br />Voice: 209-468-8504 <br />Fax: 209-468-3078 <br />4/20/2010 <br />