Workplan activities are tentatively proposed as follows: <br />Date <br />Activity <br />Note <br />30 June 2010 <br />Meet on site with pump installation contractor <br />Pumps will be identical to each <br />to evaluate existing electrical service, options <br />other, possibly the same as <br />for pumps <br />Module 4. <br />31 July 2010 <br />Identify pump make and model <br />30 Sept. 2010 <br />Complete control panels' Process and <br />Instrumentation diagrams <br />31 Oct. 2010 <br />Submit requirements to EPG Industries <br />(pump control panel manufacturers) <br />30 Nov. 2010 <br />Submit requirements for leachate tank pump <br />control panel to contractor <br />Review shop drawings from EPG, submit <br />30 Dec 2010 <br />comments. Review shop drawings from <br />control panel manufacturer, submit <br />comments. <br />31 Jan 2012 <br />Receive final design from contractors, <br />approve assembly <br />May 2012 <br />Assembly of panels complete <br />June 2012 <br />Panels and pumps arrive on site <br />July 2012 <br />Install panels and pump <br />August 2012 <br />Complete piping for new pumps <br />Sept 2012 <br />Construction complete <br />One year before due date <br />Module 1-3 LCRS Pump Control Upgrade 5 North County Recycling Center and Sanitary Landfill <br />May 26, 2010 San Joaquin County <br />