Laserfiche WebLink
h. The waste load checking program should be consist of the following activities:Inspection of random in-coming loads;training of <br /> facility personnel in hazardous waste recognition and proper hazardous waste handling procedures;reporting incidents of unlawful <br /> disposal to specific agencies.Annette Borges, Solid Waste Manager and Michael Carroll,Senoir Solid Waste Engineer,can be <br /> contacted at(209)468-3000 for emergencies and hazardous waste inquiries_Additional measures may be required upon the <br /> request of the LEA or the Board. <br /> i. Anticipated changes in design and operation in the next 5 years are: <br /> 1. The introduction of new recycling methods and programs <br /> j. Operating Hours: <br /> 7:00 a.m.—5p.m.-Daily <br /> Operations conducted in the hours of darkness require lighting as approved by the LEA. <br /> The service life expectancy is 42 years.The estimated closure date is 2035. <br /> 2. The following documents describe and condition the design and operation of the facility. <br /> a. San Joaquin County Land Use Permit No.UP-89-2 <br /> b. Environmental Impact Report dated March, 1989, SCH 88060714 and the Addendum to the final EIR dated <br /> c. PG&E easement document dated December 1951 <br /> d. Regional Water Quality Control Boards Waste Discharge Requirements Order R5-2002-0219,July 19,2002 <br /> e. Final Environmental Impact Report dated March 1989,SCH 88060714 and the addendum to the final EIR dated October, 1990. <br /> The mitigated Negative Declaration dated October, 1992,SCH 92082082. <br /> L Report of Disposal Site Information(RDSI)dated July, 1989 and amendment to RDSI dated October, 1990 <br /> g. U.S.Army Corps of Engineers Nationwide Permit#26 dated June 26, 1990 <br /> h. Report of Waste Discharge dated October,2002 <br /> i. .Wetlands Mitigation Plan dated May, 1990 <br /> j. Mitigation Monitoring Plans dated October, 1990 and October 27, 1992 <br /> k. Agreement regarding proposed stream and lake alteration from the State Department of Fish and Game dated September 10, 1990. <br /> 1. Household Hazardous Waste Plan dated August 1992 and the Operations Plan for the North County Recycling Center dated <br /> January, 1992. <br /> m. San Joaquin County Air Pollution Permit 89-468 dated July 31, 1990. <br /> 3. San Joaquin County,Public Health Services,Division of Environmental Health has made the following findings in accordance with <br /> Public Resources Code 50000 and 50000.5: <br /> a. San Joaquin County Planning Department has made a determination the NCSL is consistent with the County General Plan.The <br /> zoning designation was approved on August 10, 1989 and lists this as a compatible use. <br /> b. This facility is consistent with County Solid Waste Management Plan Dated March, 1986 <br />