Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Consecutive inspections needed for the project will be scheduled with <br />EHD inspector on site after the first inspection. <br />Inspections will be coordinated with EHD for the following work: <br />1. Well Installation <br />2. Backfill of abandoned borings <br />SWD understands that drilling the well borehole does not require <br />inspection by EHD. . <br />SWD will schedule inspections with EHD, between 9:00 a.m. and 4:00 p.m <br />during working days. SWD will pay overtime for inspections that require <br />overtime hours by EHD staff. <br />Work Plan- Groundwater Monitoring Well Installation <br />May7, 2013 <br />4 <br />San Joaquin County <br />Department Of Public Works <br />Solid Waste Division <br />