1.6 UTILITIES CLEARANCE <br />Prior to drilling, Underground Service Alert (USA) will be notified. Drilling <br />locations near overhead power lines will be checked for drill rig clearances <br />before drilling. Well locations will be adjusted as needed. <br />1 2.0 WELL DRILLING <br />I <br />C <br />r <br />2.1 UNCOMPLETED BORINGS <br />If a boring is not drilled to depth by the end of a working day, the hollow stem <br />auger will be left in the uncompleted boring. The opening of the auger will be <br />covered to prevent materials falling inside the auger. The drilling area will be <br />cordoned with safety cones. <br />2.2 ABANDONED BORING <br />Borings that are difficult to drill or do not encounter groundwater will be <br />abandoned as determined in the field by SWD. A new boring will be drilled. <br />Abandoned borings will be grouted with neat cement. <br />3.0 WELL CONSTRUCTION AND COMPLETION <br />It is anticipated that the groundwater wells will be constructed immediately after <br />drilling. Well construction will be according to the well details (Figure 4) and to <br />the technical specifications (Appendix A). SWD's consulting Soil's Engineer or <br />Geologist will log the well installation and provide well logs. <br />Well installation will be in the presence of EHD inspector. SWD's will <br />notify EHD Unit 6 inspector(s) at least five (5) working days in advance <br />about the project schedule and the date and time for the first inspection. <br />Work Plan- Groundwater Monitoring Well Installation San Joaquin County <br />May7, 2013 Department Of Public Works <br />3 Solid Waste Division <br />The wells will be drilled and developed by Gregg Drilling, a licensed C-57 <br />Contractor. A hollow stem auger drill rig is anticipated to be used to drill the <br />wells. If the drillings becomes difficult, at any site, then a different type of drill rig <br />will be brought in. <br />SWD's consultant soils Engineer or Geologist will observe the drilling and <br />develop a boring log. Spoils will be dispersed around the drilled boring. <br />I <br />C <br />r <br />2.1 UNCOMPLETED BORINGS <br />If a boring is not drilled to depth by the end of a working day, the hollow stem <br />auger will be left in the uncompleted boring. The opening of the auger will be <br />covered to prevent materials falling inside the auger. The drilling area will be <br />cordoned with safety cones. <br />2.2 ABANDONED BORING <br />Borings that are difficult to drill or do not encounter groundwater will be <br />abandoned as determined in the field by SWD. A new boring will be drilled. <br />Abandoned borings will be grouted with neat cement. <br />3.0 WELL CONSTRUCTION AND COMPLETION <br />It is anticipated that the groundwater wells will be constructed immediately after <br />drilling. Well construction will be according to the well details (Figure 4) and to <br />the technical specifications (Appendix A). SWD's consulting Soil's Engineer or <br />Geologist will log the well installation and provide well logs. <br />Well installation will be in the presence of EHD inspector. SWD's will <br />notify EHD Unit 6 inspector(s) at least five (5) working days in advance <br />about the project schedule and the date and time for the first inspection. <br />Work Plan- Groundwater Monitoring Well Installation San Joaquin County <br />May7, 2013 Department Of Public Works <br />3 Solid Waste Division <br />