My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Permits to drill and install groundwater monitoring wells will be obtained by the <br />County from San Joaquin County Environmental Health Department (EHD). The <br />Engineer will provide the Contractor a copy of the approved permit. <br />1.04 INSPECTION <br />A. <br />For the purpose of this section, installation refers to placing material in a <br />borehole. Well Installation does not include drilling the borehole. <br />B. <br />Installation of groundwater wells shall be in the presence of EHD inspectors. <br />C. <br />The Engineer will be in charge of scheduling well installation inspections with <br />EHD. Contractor shall not coordinate any inspections with the EHD unless <br />authorized by the Engineer. <br />D. <br />EHD inspection hours are from 9.00 a.m. to 4.00 p.m. each working day. Well <br />installation shall be during EHD's inspection hours. <br />E. <br />Contractor shall provide the Engineer three days' notice for well installation. <br />Engineer will provide two days' notice to EHD. <br />1. Contractor shall confirm with the Engineer the approximate time <br />Contractor's crew will be ready for the first inspection for a project before <br />24 hours. <br />2. Contractor shall confirm consecutive inspections needed for the project <br />with the Engineer in the field based on the work progress after the first <br />inspection. The Engineer will then schedule inspections with EHD <br />inspector. <br />PART 2 <br />PRODUCTS <br />2.01 <br />GENERAL <br />All materials shall be new and free of defects. Contractor shall inspect materials <br />before installing. Contractor shall replace defective materials at no additional <br />cost to the County. <br />2.02 <br />WELL CASING <br />The well casing shall be schedule 80, flush -threaded polyvinylchloride (PVC). <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 2 Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.