My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />11 <br />0 <br />B. Measurement of depth will be by weighted tape or other method acceptable to <br />the Engineer. <br />C. Payment for abandoned borings shall be by the unit price per linear foot quoted in <br />the bid. The unit price quoted shall include full compensation for final grade <br />restoration. <br />6.05 WELL SURFACE COMPLETION <br />A. Measurement shall be per the number installed. <br />B. Payment for each surface completions shall be per lump sum cost quoted in the <br />bid proposal. The lump sum cost shall include full compensation for furnishing all <br />labor, materials, tools and equipment for: <br />1. Purchasing or fabricating the well enclosure <br />2. Painting the well enclosure <br />3. Installing the well enclosure with the concrete well shirt <br />4. Inscribing the date and well No. on the concrete well skirt <br />5. Labeling the well enclosure <br />6. Installing well plugs and filling sand inside the well enclosure <br />Groundwater Monitoring Well Specifications <br />IE <br />San Joaquin County <br />Public Works Dept <br />Solid Waste Division <br />A. <br />Mobilization/ demobilization shall include all work according to mobilization <br />anddemobilization specifications in the Scope of Work, and according to the <br />specifications specified herein. Demobilization shall include submittal of required <br />reports. <br />B. <br />Payment for mobilization/demobilization will be based on the lump sum price <br />quoted in the proposal. <br />6.03 <br />GROUND WATER WELL <br />A. <br />Measurement of depth will be by weighted tape or other method acceptable to <br />the Engineer. <br />B. <br />Payment shall be per unit price per linear foot as quoted in the bid proposal. <br />Payment shall include drilling the well boring, and installing the well with EHD <br />inspection as shown on the contract figures and as specified herein. <br />6.04 <br />ABANDONED BORINGS <br />A. <br />Abandoned borings include drilling and filling abandoned borings. <br />C <br />11 <br />0 <br />B. Measurement of depth will be by weighted tape or other method acceptable to <br />the Engineer. <br />C. Payment for abandoned borings shall be by the unit price per linear foot quoted in <br />the bid. The unit price quoted shall include full compensation for final grade <br />restoration. <br />6.05 WELL SURFACE COMPLETION <br />A. Measurement shall be per the number installed. <br />B. Payment for each surface completions shall be per lump sum cost quoted in the <br />bid proposal. The lump sum cost shall include full compensation for furnishing all <br />labor, materials, tools and equipment for: <br />1. Purchasing or fabricating the well enclosure <br />2. Painting the well enclosure <br />3. Installing the well enclosure with the concrete well shirt <br />4. Inscribing the date and well No. on the concrete well skirt <br />5. Labeling the well enclosure <br />6. Installing well plugs and filling sand inside the well enclosure <br />Groundwater Monitoring Well Specifications <br />IE <br />San Joaquin County <br />Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.