Laserfiche WebLink
a. This facility must comply with all s. Additional information concerning the design <br />state minimum standards for solid waste and operation of the facility shall be furnished <br />handling and disposal. upon request and within the time frame <br />specified by the LEA. The operator must <br />b. This facility must with all federal, supply the LEA with any information the LEA <br />state, and local requirements and deems necessary to conduct an inspection or to <br />Page 6 of 11 <br />abandonments must be completed <br />h. NCRC&SL shall comply with the <br />under San Joaquin County Public <br />Methane Monitoring Program as described in <br />Health Services permits. <br />Title 27 CCR Section 20921 (b). <br />Provisions: <br />i. The operator shall at all times provide <br />a. The permit is subject to review by the <br />adequate staffing to deal effectively and <br />Local Enforcement Agency, and may be <br />Promptly with operations at the site as needed. <br />modified, suspended, or revoked, for <br />J The operator shall at all times provide <br />sufficient cause after a hearing. <br />adequate numbers and types of operable <br />b. The use of 60 -mil high density <br />equipment for compaction and placement of the <br />polyethylene (HDPE) liner as described <br />Waste and cover at the facility.. <br />in the existing Waste Discharge <br />k. All documentation relating to the <br />Requirements 91-021 dated January, 1991 <br />Preparation of the closure and post closure <br />has been approved by the Regional Water <br />maintenance costs shall be retained by the <br />Quality Control Board, the Local <br />operator and shall be available for inspection <br />Enforcement Agency, and the <br />by the LEA or Calrecycle. <br />California Integrated Waste Management <br />Board. The liner shall consist of 6 inches <br />I. The preliminary closure and post closure plans <br />of compacted soil overlain by HDPE <br />were updated on July 24, 2008. <br />synthetic liner. <br />c. Each waste module shall have a <br />m. The final Closure and Post closure Plan must <br />dendritic leachate collection and removal <br />be submitted to the LEA, Regional Water <br />system directly over the HDPE synthetic <br />Quality Control Board, and Calrecycle <br />liner. <br />two years prior to closure of the landfill. <br />d. NCSL shall comply with the <br />n. This facility must comply with all state <br />monitoring and reporting program of <br />minimum standards for solid waste handling <br />California Regional Water Control <br />and disposal. <br />Board. <br />o. This facility must comply with all federal, <br />Closure & Post Closure Maintenance: <br />state, and local requirements and enactments, <br />including all mitigation measures given in <br />a. All documentation relating to the <br />any certified environmental document filed <br />preparation of the closure and post <br />pursuant to the Public Resources Code, Section <br />closure maintenance costs shall be <br />21081.6. <br />retained by the operator and shall be <br />P• A log of special occurrences, i.e., fires, <br />available for inspection by the LEA or the <br />explosions, accidents, hazardous wastes, etc., <br />CIWMB. <br />shall be maintained and reported to the LEA <br />b. The preliminary closure and post <br />on an annual basis and no later than December <br />closure plans were approved by the <br />31 of each year. <br />CIWMB on October 31, 1991 No. 91-39. <br />q Any other information concerning the landfill <br />c. The final Closure and Post closure <br />must be provided to the LEA upon request. <br />Plan must be submitted to the LEA, <br />r. An adequate water supply for dust and fire <br />Regional Water Quality Control Board, <br />suppression shall be available at all times <br />and the CIWMB two years prior to <br />during the operation of this facility. The water <br />closure of the landfill. <br />supply must be acceptable to the local fire <br />Conditional Requirements: <br />jurisdiction and the LEA. <br />a. This facility must comply with all s. Additional information concerning the design <br />state minimum standards for solid waste and operation of the facility shall be furnished <br />handling and disposal. upon request and within the time frame <br />specified by the LEA. The operator must <br />b. This facility must with all federal, supply the LEA with any information the LEA <br />state, and local requirements and deems necessary to conduct an inspection or to <br />Page 6 of 11 <br />