My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:02 AM
Creation date
7/3/2020 11:02:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2008.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San loo uin Count PW—Solid Waste Responses to Comments <br /> 9 Y <br /> N,,c-vmbar 3,1066 <br /> F n,I vt" <br /> opctattons will occur before sunrise and alter sundown. Please discuss adequate lighting-and any,impacts 14-4 <br /> associated with light and Glare. <br /> Np1Se <br /> .I he Noise analysis indicatu�that normal business and refuse collection operations could exc:eod the <br /> davtinvc noise standard at the nearest residence It allo.concluded that operation,under the proposed <br /> Project dying the hours between 5:30 a-m.and TW aan.fall into the category of nighttime hours. <br /> Noise monitoring sites were selected to re.Tvrescat noise-sensitive land uses in the prc�jcet area and provide <br /> fea <br /> reference locations r the assessment of prujec:t-related noise impacts. 'Die monitoring sites selected are <br /> all north of the facility. 'nom are also oth€r nice-sensitive land uses near the facility. Why were 4-5 <br /> monitoring sites selected only north of the facility? Noise monitoring should include locations to all <br /> directions of the facility. <br /> The proposed Project includes an additional piece of heavy cquipmcnt,increased traffic and additional 14.6 <br /> waste being processed at the landfill that should also be considered in the Noise analysis. <br /> C)ther r�ctiuities <br /> The project description states the SKMPW is also proposing to clarify the use of the site as follows: <br /> "(Act activities. 'rite landfill facility may be visited by County employees or other <br /> authorized personnel for other uses at any time. Such uses would include administrative <br /> tasks,equipment maintenance,operation of environmental control facilities, and use of <br /> constnutirht <br /> equipment as need to maintain compliance with outer permit retlnircmen&c." <br /> Agairt,it is Board staff's opinion that only under emergency situations should activities be conducted <br /> beyond the hours of 5:30 a.m.to 7:00 p.m. If this is not the case,include a very specific list of activities � 4-7 <br /> that may be conducted and the frequency that they may occur in the FFIR <br /> air Quality <br /> Page 3.2-10 of the DEIR states that the impacts analyzed"...are limited to operation-related impacts <br /> because it is anticipated that no construction activities will occur as,part of the propaced project.,, Page <br /> 3.2-11 states"Ctperation activities could result in direct and indirect impacts on air quality caused by 4-8 <br /> ground disturbance or mgetation clearing as part gfpro ect construction or as a result of pro�jcct <br /> operations." Tito Traffict'Transportation section,page 3.13-13,states the proposed project would not <br /> invxVve conatrnict ion aativiiaess the cstablisbuient of future landfill modules is considered to be part of the <br /> existing operations. <br /> T hesc statements are confusing as to whether construction activities-were considered in the analysis of the <br /> proposed Projeot. Please discuss the cumulative impacts associated with the construction of landfill <br /> modules with the proposed increase in equipment,tonnage and traffic at the landfill. <br /> Geology and Soils <br /> Section 3.5 of the EIR geology&Soils,discusses the applicability of 27 CCFR regarding earthquake:, <br /> liquefaction,landslides(and slope stability hazards)as well as mitigation measures from impacts of(tic <br /> above_ 'What has been submitted in the Di-'I12 is conceptual in nature and not adequate for design <br /> purposes. 4-9 <br /> In order to determine whether the slopes are stable(as a result of the proposed vertical expansion of 230') <br /> and that the landfill will withstand a vlaximuan Probable FarthguAc(MPP),design calculations need to <br /> be submitted. Such designs should include all factors(assumed and actual)used in the calculations to <br /> V.Pr,�jcae,Cowty of San ioaquuti06307.06 No,County Latt dYti EB2403_Raports-,Ma#y.xs admin kEiRt(higinal coumtcnt Ietttvs-CQ,vncnts <br /> by CUMNIB SLt'DEIR.doc <br /> Final Environmental Impact Report November 22 2006 <br /> NCRC&SL Permit Revision 2-31 <br /> J&S 06307.06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.