My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
1831
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2010-0016 -13- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />NORTH COUNTY LANDFILL <br />SAN JOAQUIN COUNTY <br />Title 27 standards (56.2 gal/min and 145.8 gal/min, equal to twice the computed <br />anticipated peak leachate flow rates). The results of site-specific unsaturated zone <br />modeling (using V -Leach software) based on the above data indicated <br />concentrations in groundwater below laboratory detection limits (i.e., < 1.0 µg/L) for <br />all modeled constituents after 100 years. <br />51. Previous WDRs Order No. R5-2002-0219 approved the above EAD for Module 4 <br />and future modules. Module 4 was constructed in 2004 consistent with the <br />approved EAD and LCRS design. Construction of the module was documented in <br />the November 2003 report Final Construction Quality Assurance Report for Module <br />4 at the North County Recycling Center and Sanitary Landfill, prepared by Vector <br />Engineering, Inc. <br />Grading and Drainage <br />52. Modules 1 through 4 included the following grading features: <br />a. 3H:1 V interior excavation slopes; <br />b. 3H:1V exterior slopes; <br />c. Side slope benching every 50 vertical feet (20 -foot wide benches). <br />53. Precipitation and drainage controls installed on the modules included: <br />a. Top decks graded at 5% minimum for drainage. <br />b. Soil berms along top deck perimeter to direct runoff to corner drop inlets. <br />c. Overside (O/S) drains to capture top deck and side slope bench runoff. <br />d. Side slope benches graded at 2% with central "V" drains to intercept and <br />convey runoff to O/S drains. <br />e. Soil berms and outboard ditch within 100 -foot setback area along east, west, <br />and south site perimeter to divert run-on and convey runoff to natural drains. <br />54. Runoff from the landfill is handled as follows: <br />a. Inactive modules (i.e., M1, northern portion of M3) - runoff directed east into <br />ISB ditch system. <br />b. Active modules (i.e., M4, southern portion of M3) - runoff directed south to <br />temporary pond in future Module 5 and 6 excavation areas. <br />c. Future Module 5 and 6 areas - water from excavation area periodically <br />pumped out to ditch that flows to ISB. <br />d. Future Modules 7 through 11 areas — Runoff from these areas either flows <br />directly to the ISB ditch system, or collects in low areas and is pumped into the <br />ISB ditch system as part of site maintenance. The ISB ditch system drains to <br />ISB. <br />
The URL can be used to link to this page
Your browser does not support the video tag.