My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
1831
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2010-0016 -14- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />NORTH COUNTY LANDFILL <br />SAN JOAQUIN COUNTY <br />Future Modules <br />55. Future module development will be in a sequential, counter -clockwise order. Each <br />new module will be constructed in advance of filling the prior module to final refuse <br />grade. The latter will occur before filling of the new module begins. Existing <br />facilities in the eastern area of the site (e.g., MRF and gas wells SG -5, 6 and 7) will <br />be decommissioned prior to development of that area. <br />56. The Discharger plans to construct future modules consistent with existing <br />approvals for Module 4, or as separately proposed and approved for a new <br />module. Specific designs and construction plans will be submitted for approval as <br />each module is proposed for development. Construction Specifications D.1 <br />through DA of these WDRs require that new modules be constructed in <br />accordance with either the Title 27 prescriptive standard design or the approved <br />EAD and performance demonstration for Module 4. Construction Specification DA <br />further allows for the Executive Officer to approve less than significant changes to <br />these designs, but requires Board approval of substantive changes. <br />Vertical Expansion Plan <br />57. The JTD submitted by the Discharger incorporates the Discharger's Vertical <br />Expansion Plan (VEP) for the landfill (December 2007 report 30% Design Report <br />for Vertical Expansion of the North County Recycling Center and Sanitary Landfill, <br />prepared by Shaw Environmental, Inc.). Vertical expansion is proposed as a <br />component of a revision of the Facility Operating Permit. The VEP would increase <br />the height of the landfill modules as follows: <br />Module Fill Elevation, Feet MSL1 Fill Thickness, Ft 1,2 <br />Avg. Base Previous Maximum Proposed Maximum <br />1 <br />87 <br />190 <br />235 <br />148 <br />3 <br />65 <br />190 <br />2303 <br />165 <br />4 <br />64 <br />190 <br />300 <br />228 <br />5-11 <br />66 <br />190 <br />320 <br />254 <br />1. Maximum elevation includes cover material. <br />2. Maximum difference between proposed final grade and base elevation contours. <br />3. Fill height reduced from 260 feet MSL based on results of geotechnical analysis (see <br />Finding 58). <br />Existing Modules 1 through 4 would be filled to the proposed maximum fill <br />thickness (148 — 228 ft MSL) prior to filling at Module 5, which, in turn, would then <br />be filled to its maximum thickness (254 ft MSL) before initiating operations in <br />Module 6, and so on. <br />
The URL can be used to link to this page
Your browser does not support the video tag.