My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
1831
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2010-0016 -12- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />NORTH COUNTY LANDFILL <br />SAN JOAQUIN COUNTY <br />Sampling Sampling Location Source of Flow Type <br />Point <br />SW -1' Representative upstream location Runon or direct rainfall <br />Runon <br />SW -2 Outfall to eastern perimeter ditch ISB Runoff <br />SW -32 Outfall to South Paddy Creek - Eastern Perimeter Runoff <br />Upstream Ditch <br />SW -4 Outfall to South Paddy Creek - Western Runoff <br />Down stream Perimeter Ditch <br />SW -53 SW Outfall to natural drain WesPerimeter Ditch rn Runoff <br />SW -63 SW Outfall to natural drain perSouthern Runoff <br />ir 1. SW -1 may be any upstream location in the storm water drainage system representative of <br />background storm water conditions. <br />2. No sampling required at this monitoring point if at time of sampling only source of flow is that <br />from SW -2. <br />3. Future discharge locations. <br />The results of storm water monitoring for these constituents shall be summarized <br />in the monitoring reports submitted under this Order. If there is no discharge <br />from the site during the monitoring period, or the Discharger did not obtain <br />samples of the discharge, the Discharger shall state the reasons and <br />circumstances in the monitoring report. <br />2. Surface Water <br />Surface water sampling shall be collected at upstream monitoring point S-1 and <br />down stream monitoring point S-2, as shown on Attachment B: Site Map. <br />Monitoring shall be conducted for the parameters and constituents, and at the <br />corresponding frequencies, listed in Table F.3.c, except for Redox potential, <br />which need not be monitored. Creek elevation may be estimated based on <br />observation. <br />Records <br />The Discharger shall retain records of all monitoring information, including all <br />calibration and maintenance records, all original strip chart recordings of <br />continuous monitoring instrumentation, copies of all reports required by this <br />Order, and records of all data used to complete the application for this Order. <br />Records shall be maintained throughout the life of the facility including the <br />postclosure period. Such legible records shall show the following for each <br />sample: <br />
The URL can be used to link to this page
Your browser does not support the video tag.