Laserfiche WebLink
U <br />C <br />Section 21820(a) requires cost estimates meeting the following criteria: <br />1. Cost estimates for the activities anticipated <br />2. Cost estimates for the design, materials, equipment, labor, administration, and <br />quality assurance for closure <br />3. Cost estimate contingency of 20 percent <br />The closure cost estimate for this PCPMP is presented and summarized in Appendix D. This <br />closure cost estimate is based on applicable elements in the cost template established by <br />CIWMB. The estimated closure cost for the final closure of the landfill footprint is <br />approximately $12 million (Table 2 and Appendix D). This estimate is based on third party <br />contractor construction services. <br />PCMP for NCRCSL 2-11 <br />GISan Joaquin CountylNCRCSL11180401PCPMPIFinal ReportlPCPMP—Rev_Jan-2010.Doc <br />Department of Public Works/Solid Waste <br />County of San Joaquin — January 7, 2009 <br />