My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 11:02:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />5.3.2 Base Preparation and Liner Placement Plans <br />The base of each module will provide drainage to a sump, from which leachate will be removed <br />(Appendix B, Drawing 2). The sump for each module will be located on the permanent exterior <br />edge of the landfill. This will allow access to the leachate sump via a side slope leachate riser. <br />Each module will be separately designed and submitted for approval based on the requirements <br />of the state regulations and permits (including WDRs) in effect at the time of submittal. <br />5.3.3 Fill Sequencing Plans <br />Currently MSW is being placed in Module 4, with Module 5 area serving as the existing borrow <br />area. The County intends to fill Modules 1 through 4 to near final maximum permitted elevation in <br />accordance with the revised permit height. Module 5 will be constructed in advance of Module 1- <br />4 reaching its permitted refuse fill capacity. Once Module 5 is approved for disposal by the <br />appropriate regulatory agencies, refuse placement will begin in Module 5 with the future borrow <br />area for daily cover in Module 6 area. This process will be repeated for the remaining Modules 6 <br />through 11 (See Appendix B, Preliminary Closure/Postclosure Maintenance Plan for fill <br />sequencing). <br />5.4 LEACHATE COLLECTION AND REMOVAL SYSTEM <br />All modules will have a leachate collection and recovery system (LCRS). Leachate collection <br />systems include collection troughs with lateral and header piping surrounded with drainage <br />gravel. Each lateral leachate pipe will be equipped with a pipe riser for inspection and cleaning if <br />necessary. Leachate will drain along the troughs to a leachate sump. The sumps will include <br />pumps with sensors and automatic controls to maintain a low leachate level. Above -ground <br />leachate storage tanks are and will be used as needed to receive leachate pumped from the <br />sump, in advance of leachate handling for disposal. Leachate will be returned to the landfill in <br />accordance with the WDRs (Appendix A). <br />North County RC&SL <br />Joint Technical Document <br />Page 27 of 69 Public Works/Solid Waste <br />County of San Joaquin — February 10, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.