My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:04:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a preconstruction survey of the site for the presence of the San Joaquin kit fox. If any kit foxes are found, <br /> precautions specified in Chapter 4.2 Mitigation 4.2-4 of the Final EIR shall be taken. <br /> 21. Not more than 60 days prior to construction,professional biologist retained by the applicant shall conduct <br /> a preconstruction survey of the site for the presence of Burrowing owls and avoid adverse impacts on <br /> Burrowing owls; if present, as specified in Chapter 4.2, Mitigation 4.2-6 of the Final EIR. <br /> 22. The driveway approaches with a right-tum lane at the north entrance shall be improved in accordance with <br /> the requirements of San Joaquin County Standards R-17 and R-27 prior to issuance of the occupancy <br /> permit. (Development Tide Section 9-1145.5) <br /> 23. Dedicate a 42-foot wide right-of-way from the centerline of MacArthur Drive to the property line along <br /> the frontage of APN 253-130-19. (Development Tide Section 9-1150.2) <br /> 24. MacArthur Drive from the southerly driveway to Linne Roads be upgraded structurally to provide for <br /> the difference between the present Traffic Index and the Traffic Index for the proposed development. The <br /> upgrade shall be constructed in conformance with the Improvement Standards and Specifications of the <br /> County of San Joaquin. All improvement plans and specifications must be approved by the County of San <br /> Joaquin Department of Public Works prior to approval of the Improvement Plan. (Development Title <br /> Section 9-1150.2) <br /> 25. An encroachment permit shall be required for work within the road right-of-way. (Development Title <br /> Section 9-1145.2) <br /> 26. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable prior <br /> to the time of building permit application. Eighty percent of the fee may be deferred over a period not to <br /> exceed five years by entering into a Deferred Traffic Impact Mitigation Fee Payment Agreement with the <br /> County. If deferred, the initial payment is 20 percent of the total fee based on $249.99 per daily trip-end <br /> generated in the Tracy area. The fee shall be automatically adjusted annually be the Engineering <br /> Construction Cost Index a published by the Engineering News Record. (Resolutions R-90-304,R-91-1025 <br /> and R-93-167) <br /> 27. The applicant shall prepare an analysis of Corral Hollow Creek for a 24-hour, 100-year storm event. If <br /> necessary, berming shall be constructed to protect the site. <br /> 28. A soil suitability study,as required by Development Title Section 9-1105.2(d),which indicates that the area <br /> is suitable for a septic tank system must be performed prior to recordation of the Parcel Map. A review <br /> fee is required at the time of submittal to the Environmental Health Division. <br /> 29. Construction of an individual sewage disposal system under permit and inspection by the Environmental <br /> Health Division is required a the time of development. (Development Title Sections 9-1110.3 and 9- <br /> 1110.4) <br /> 30. State on revised plans or improvement plans the maximum number of employees the sewage disposal <br /> system is being designed for and that the leach field area will be barricaded so that it cannot be driven <br /> over,parked on or used as a storage area. This leach field area must be used for that specific purpose only <br /> and cannot contain any underground utility lines. (Development Title Section 9-110.4(c)(5)) <br /> 31. Construct a water well under permit and inspection of the Environmental Health Division prior to <br /> occupancy. Should the number of nonresident individuals exceed 24 for at lest 60 days per year, or the <br /> number of service connections exceed four, a yearly permit to operate a public water system under the <br /> provisions of California Code of Regulations, Title 22, will be required by the Environmental Health <br /> Division and Development Tide Sections 9-1120.2 and 91115.9 <br /> L:1PROJECT/397/NW1RC14.TCY December 15, 1993 <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.