My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1993_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 11:04:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1993_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan <br />November 9, 1993 <br />Page 8 <br />Stormw, <br />stet <br />Does the owner/operator have a means of hauling wastewater <br />in the event that the 2 foot freeboard is compromised during <br />A18 <br />a major storm event? <br />Surface Drainage <br />The FEIR should include the drainage ;plan to control and/or <br />divert surface runoff. Will this facility be: <br />able to handle <br />a 25 -year, 24-hour storm event? Will surface drainage <br />A19 <br />patterns be altered due to the use of tarps during the rainy <br />.season? Will compost area runoff waters be analyzed for <br />contaminants, if so, at what location(s) and how often? <br />What portion of the site will be covered by impervious <br />surfaces? <br />A20 <br />Groundwater <br />Page Pa 67 of the DEI . �� <br />gR states, .It is recommended that a <br />minimal groundwater monitoring program be institutedatthe <br />project site, in order to maintain documentation of <br />groundwater quality.,, Will groundwater monitoring wells be <br />located a0sthe site, and if so, how many? How will these <br />wells be situated in relation to ;the downgradient flow of <br />the groundwater underneath the proposed project site? The <br />FEIR should- identify how wells will be used to monitor any <br />A21 <br />potential groundwater contamination. The FEIR should state <br />how deep well casings would extend to prevent potential well <br />-contamination. What provisions will there be to monitor the <br />vadose zone for potential leachate saturation? What <br />designated constituents will be tested on the samples from <br />the groundwater monitoring wells, and how frequently will <br />they be tested? <br />On <br />-Site Storage qfDiverted and/or Pra cased Ma eriala <br />The FEIR should indicate 'the storage capacities, methods of <br />storage, and duration of storage of all stored/stockpiled <br />A22 <br />materials with the storage locations on a map. <br />Cumulative Impacts <br />The DEIR states that the only significantcumulative <br />_impact of this project would be the cumulative effect <br />of elimination of Swainson's hawk foraging habitat. <br />A23 <br />However, mitigation measure 4.2-5 reduces this impact <br />
The URL can be used to link to this page
Your browser does not support the video tag.