Laserfiche WebLink
Kerry Sullivan <br /> November 9, 1993 <br /> Page 7 <br /> equipment, procedures for evacuation of the premises, and <br /> notice for contacting the appropriate authorities in the <br /> event of such an occurrence. CIWMB staff request than such <br /> a plan be included/described in the FEIR with the <br /> appropriate mitigation measures in the event of such an <br /> occurrence <br /> The FEIR should include a complete description of the <br /> proposed facility' s equipment and fire protection <br /> system/equipment, including, but not limited to, equipment A13 <br /> containing fire:.extinguishers. What is the response time <br /> for the nearest San Joaquin County Fire Department location? <br /> List thero osed hygienic facilities in <br /> p p yg , the FEIR as well as <br /> safety and first aid equipment accessibility as well as ;A14 <br /> provisions for the permanent site and potable water supply. <br /> Vector Control <br /> f <br /> Potential impacts from vectors exists and should be <br /> addressed in the FEIR. A pest management plan should be <br /> included. What measures will be implemented to manage the A15 ' <br /> potential impacts/effects from vectors, including rodents? <br /> What is the maximum storage time for salvaged materials? <br /> Air-Quality <br /> Anticipated impacts on air quality from an increased number <br /> of vehicles entering the proposed site, dust which may be <br /> generated from vehicles and equipment to accommodate <br /> construction and facility operations, and dust and odors <br /> resulting from composting operations,' should be thoroughly <br /> described in the FEIR. How will spore production, A16 <br /> specifically Aspergillus mold, be mitigated? How will dust <br /> impacts be mitigated from the processing and handling of <br /> solid wastes? Will misters be used inside the MRF to <br /> suppress dust? Measures to mitigate .these impacts should be <br /> - incorporated into the FEIR. <br /> Noise <br /> Activities associated with the proposed project, including <br /> baling, sorting, and grinding, may result in an increase in <br /> on-site noise levels which could impact the public and site " A17 ' <br /> personnel . How will the public and site personnel be <br /> protected from detrimental on-site noise levels? <br />