Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />CORRAL HOLLOW SANITARY LANDFILL <br />FINAL CLOSURE PLAN - REVISED FEBRUARY, 1995 <br />9.0 STRUCTURE REMOVAL <br />Those structures that would have to be removed include the mobile <br />gatehouse/office building and metal maintenance building. The <br />gatehouse and maintenance building will be removed for reuse at <br />another site. The foundation for the metal building will be <br />removed and disposed of at the North County Recycling Center and <br />Sanitary Landfill. <br />COST <br />Structures: Move buildings and scale house <br />(Lump Sum Estimate) = $2,000 <br />Foundation removal: Demolition and removal <br />(Lump Sum Estimate) = 1,500 <br />$3,500 <br />i to]KIN 1111 4-j VT i"It � V 4 0 0 � cew:-4 k, LIP 0 �to) I'll ivy 4 3) 4# i OW4101 4 4 *611R <br />The existing gas probes from the SWAT will be decommissioned at the <br />time of installation of the Landfill Gas Monitoring System. No <br />other decommissioning of environmental control systems is needed <br />during the closure period. <br />COST <br />(lump sum estimate)= <br />22 <br />DEPIM <br />