Laserfiche WebLink
(B) Perform laboratory tests as specified in Subsection (e) ; and <br /> (C) Field tests as specified in Subsection (f) . <br /> 1. The operator shall perform permeability tests in the test area <br /> under saturated conditions by using the standard test method ASTM <br /> Designation: D 3385-88 (approved 2/88] , ("Standard Test Method for <br /> Infiltration Rate of Soils in Field Using Double-Ring <br /> Infiltrometers, 11 which is incorporated by reference, for vertical <br /> permeability measurements. A sufficient number of tests shall be ' <br /> run to verify the results. Other. methods that provide an accurate <br /> and precise method of measuring field permeability may be utilized <br /> as approved by the local enforcement agency and the Board. <br /> (D) Correlations between laboratory tests and test pad results <br /> shall be established for each of the various types of fill <br /> materials and blends to- be used in construction of the actual <br /> cover. <br /> (h) Earthen Material Requirements <br /> (1) The following minimum tests shall include, but not be limited <br /> to: <br /> (A) Laboratory tests as specified in Subsection (e) ; and <br /> (B) Field tests as specified in Subsection (f) and (g) . <br /> (2) The following minimum testing frequencies shall be performed: <br /> (A) Four (4) field density tests shall be performed for each 1, 000 <br /> cubic yards of material placed, or at a minimum of four (4) tests <br /> per day; <br /> (B) Compaction curve data (ASTM -Designation: D 1557-78)". -R <br /> graphically represented, and Atterberg limits (ASTM Designation:,-, <br /> D 4318-84) shall be .performed on the barrier layer material once <br /> a week and/or every 5, 000 cubic yards of material placed; r �M <br /> (C) For field permeability tests, representative samples shalloB <br /> be..performed .on barrier layer material; ) <br /> l.. .The frequency of testing may be increased or decreased, based <br /> on the pass/failure status of previous tests, as approved by the <br /> local enforcement agency and the Board. <br /> 2 . Field infiltration tests shall be -performed for the duration <br /> necessary to achieve steady conditions for the design permeabilityQ <br /> 3 . The following interpretive equation shall be used to determine,h <br /> the design permeability: -The infiltration rate (I) is defined as: <br /> I = Q/(tA) <br /> where: Q = volume of flow <br /> t = interval of time corresponding to flow Q <br /> A = area of the ring <br /> then the hydraulic conductivity (k) can be calculated from Darcy's . <br /> law as follows: <br /> k <br /> k1 <br /> where: I = infiltration rate A:-;,D <br /> i = hydraulic gradient. <br /> (i) Geosynthetic Membrane Requirements <br /> (1) Performance requirements for the geosynthetic membrane <br /> include, but are not limited to, the following: <br /> (A) a need to limit infiltration of water, to the greatest extent , <br /> possible; <br /> (B) a need to control landfill gas emissions; <br /> 111 7.8-17 (6/18/90) <br />