Laserfiche WebLink
File No. 20-1008-36 <br /> May 20, 1996 <br /> Page 5 of 9 <br /> Dry Laboratory Specified <br /> Test Moisture Density Compaction Relative Relative <br /> No. Date Test Location %Dry Wt. P.C.F. Curve No. Compaction Compaction <br /> CLAY BARRIER LAYER <br /> 125 11-29 N8800 E10000 12.4 116 3 92 90 <br /> 126 11-29 N8850 E9950 12.7 114 9 90 90 <br /> 127 11-29 N8850 E9975 10.6 118 9 94 90 <br /> 128 11-29 N8925 E9950 10.5 119 9 95 90 <br /> 129 11-29 N8950 E9950 12.7 113 9 90 90 <br /> 130 11-29 N8950 E9875 11.1 118 11 92 90 <br /> 131 11-29 N9025 E9850 12.0 120 11 94 90 <br /> 132 11-29 N9050 E9925 11.2 122 11 95 90 <br /> 133 12-01 N9030 E10080 11.7 122 8 94 90 <br /> 134 12-01 N9000 E10040 11.5 119 8 92 90 <br /> 135 12-01 N8950 E10075 11.3 122 8 93 90 <br /> 136 12-01 N8890 E10120 10.9 114 9 91 90 <br /> 137 12-01 N8800 E10090 12.9 116 10 91 90 <br /> 138 12-01 N8820 E10110 10.0 125 8 96 90 <br /> 139 12-01 N9010 E9920 9.1 123 8 94 90 <br /> 140 12-01 N9100 E9960 9.7 122 8 94 90 <br /> 141 12-01 N9030 E10000 10.5 119 11 93 90 <br /> 42 12-01 N8950 E10170 10.3 127 8 98 90 <br /> 12-01 N8920 E10100 10.2 123 8 94 90 <br /> 144 12-01 N9050 E10050 11.8 117 9 93 90 <br /> 145 12-01 N8920 E10200 11.3 116 9 92 90 <br /> 146 12-01 N8890 E10170 10.7 122 10 96 90 <br /> 147 12-01 N8830 E10020 9.5 118 11 92 90 <br /> 148 12-01 N8740 E10100 11.6 119 10 93 90 <br /> 149 12-01 N9000 E10150 11.2 122 8 94 90 <br /> 150 12-01 N9050 E10140 11.9 126 8 96 90 <br /> 151 12-01 N8800 E10200 11.5 120 8 92 90 <br /> 152 12-01 N8755 E10150 11.9 121 8 93 90 <br /> 153 12-01 N8750 E10200 10.2 122 11 96 90 <br /> 154 12-01 N8670 E10050 10.7 122 11 96 90 <br /> 1996 <br /> 155 01-04 N9490 E10275 13.0 124 8 95 90 <br /> 156 01-04 N9275 E10150 13.7 124 10 97 90 <br /> 157 01-04 N9210 E10190 14.0 121 10 95 90 <br /> 158 01-04 N9125 E10225 12.9 121 10 94 90 <br /> 159 01-04 N9090 E10300 15.5 121 14 96 90 <br /> 160 01-04 N9000 E10375 13.3 117 15 95 90 <br /> 161 01-04 N9050 E10475 14.6 116 15 93 90 <br /> 01-04 N9100 E10375 14.8 118 15 96 90 <br /> IF 01-04 N9175 E10375 14.5 121 14 97 90 <br /> 164 01-05 N9175 E10305 13.7 118 16 96 90 <br /> Accepted engineering and testing procedures were used for there teats. We do not undertake the guarantee of construction,nor do we relieve the contractor of his primary responsibility to produce <br /> a completed project conforming to the project plans and specifications. Copyright 1996 Sleinfelder,Inc. <br />