Laserfiche WebLink
File No. 20-1008-36 <br /> July 14, 1995 <br /> TABLE OF CONTENTS <br /> Chapter Page <br /> 1 INTRODUCTION 1 <br /> 1.1 General 1 <br /> 1.2 Purpose 1 <br /> 1.3 Background 3 <br /> 1.4 Definitions 3 <br /> 2 PROGRAM OVERVIEW 6 <br /> 2.1 General 6 <br /> 2.2 Regulatory Requirements 7 <br /> 2.3 Borrow Operation 8 <br /> 2.4 Barrier Layer Soil Design Mix 8 <br /> 2.5 Construction 9 <br /> 2.6 CQA Testing 9 <br /> 2.7 Engineering 10 <br /> 2.8 Field Observations 10 <br /> 3 PROJECT ORGANIZATION 11 <br /> 3.1 Organization Chart 11 <br /> 3.2 Outline of Responsibilities 11 <br /> 3.2.1 Project Administrator 12 <br /> 3.2.2 Project Manager 12 <br /> 3.2.3 Engineer of Record 12 <br /> 3.2.4 Survey Team 12 <br /> 3.2.5 Construction Quality Assurance(CQA) Officer 13 <br /> 3.2.6 Construction Monitor, Support Engineers 13 <br /> 3.2.7 Field Engineer 13 <br /> 3.2.8 Quality Control Technicians 14 <br /> 3.2.9 Construction Forces 15 <br /> 3.3 Professional Qualifications 15 <br /> 3.3.1 General Professional Qualifications 15 <br /> 3.3.2 Project Team Qualifications 16 <br /> 4 SOIL STOCKPILE 17 <br /> 4.1 Stockpile Investigation 17 <br /> 4.2 Construction Methods 17 <br /> 5 CONSTRUCTION CONTROL 18 <br /> 5.1 Stoppage of Work 18 <br /> 5.2 Grade Control 18 <br /> 5.3 Quality Control 19 <br /> GSM:md CIV95 Page i of ii July 14,1995 <br /> 20-1008-36(CQACOR) Copyright 1995 Kleinfelder,Inc. <br />