Laserfiche WebLink
File No. 20-1008-36 <br /> July 14, 1995 <br /> 6 CONSTRUCTION 21 <br /> 6.1 Test Pad 21 <br /> 6.2 Construction of the Final Cover 21 <br /> 6.2.1 Foundation Layer 21 <br /> 6.2.2 Barrier Layer 21 <br /> 6.2.3 Vegetative Layer 25 <br /> 7 QA/QC TESTING AND MONITORING 26 <br /> 7.1 General 26 <br /> 7.2 QA/QC Testing 26 <br /> 7.3 Construction Monitoring 27 <br /> 8 DOCUMENTATION 28 <br /> 9 NONCONFORMANCE 30 <br /> 10 MEETINGS 31 <br /> TABLES <br /> 2-1 Borrow Area Soil Test Summary <br /> 7-1 Construction Monitoring Test Methods <br /> 7-2 Red Clay Borrow Material <br /> 7-3 Test Pad Frequency of Field and Laboratory Testing <br /> 74A Final Cover Frequency of Field and Laboratory Testing(Initial 10%) <br /> 7-411 Final Cover Frequency of Field and Laboratory Testing (Final 90%) <br /> 7-5 Pase/Fail Criteria <br /> FIGURES <br /> 3-1 Organization Chart <br /> APPENDICES <br /> A- Regulatory Requirements <br /> B -Project Team Resumes <br /> C -Kleinfelder Standard Forms <br /> D -Laboratory Compaction Curves <br /> E - Summary of Test Pad Results <br /> GSM:md CH/95 Page ii of ii July 14,1995 <br /> 20-1008-36(CQACOR) Copyright 1995 Kleinfelder,Inc. <br />