Laserfiche WebLink
File No. 20-1008-36 <br /> July 14, 1995 <br /> Design Engineer - SJDPW will be responsible for the design and preparation of the project <br /> construction drawings. <br /> En ig neer- The firm or individual responsible for performing the QA/QC tasks as specified in this <br /> document. <br /> Earthwork-An activity involving the use of soil materials as defined in the Closure Plan. <br /> Earthwork Contractor - Also referred to as the "Contractor." The person or firm responsible <br /> for earthwork-related activities. This definition applies to any party performing work defined as <br /> earthwork, even if not his primary function. <br /> Foundation layer - The bottom soil layer of the final cover directly above the landfill waste <br /> which is engineered and constructed to form a base for construction of the low permeability <br /> barrier layer. <br /> O eq rator- County of San Joaquin. <br /> Project Construction Drawings and Specifications - Includes all project-related drawings and <br /> specifications including design modifications and record drawings. <br /> Project Documents - Construction drawings, record drawings, specifications, shop drawings, <br /> construction quality assurance and quality control plans, safety plan, and project schedule. <br /> Project Manager - The official representative of the SJDPW responsible for construction of the <br /> project. <br /> QA/QC - Quality Assurance and Quality Control. <br /> Quality Assurance - Confirmation that quality control functions have been adequately and <br /> correctly performed. <br /> GSM.-md M195 Page 4 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />