Laserfiche WebLink
File No. 20-1008-36 <br /> July 14, 1995 <br /> If SJDPW forces are not available, qualified contractors will be retained to perform the work. <br /> Kleinfelder Inc. will act as a third party Construction Monitor which will include the following <br /> services: <br /> Part-time observation of the import soil operations <br /> • Part-time construction observation for the foundation layer <br /> • CQA testing of the foundation layer <br /> Part-time construction observation and total CQA testing of the barrier layer <br /> ® Part-time construction observation of the vegetative layer <br /> ® Preparation of the Final CQA report and certification of the barrier layer construction. <br /> The SJDPW will serve as the Engineer of Record for site closure. Sanguinetti and Associates will <br /> provide grade control for the foundation, barrier, and vegetative layers. Kleinfelder will act as <br /> construction monitor for meeting the requirements of Section 17774, Title 14. <br /> The specific testing, monitoring, and documentation procedures are called out in appropriate <br /> sections which follow. <br /> 2.2 REGULATORY REQUIREMENTS <br /> Both the CIWMB and the RWQCB regulate landfill capping activities. Title 14, Chapter 3 of the <br /> California Code of Regulations is used by the CIWMB. Title 23, Chapter 15 of the California <br /> Code of Regulations is used by the RWQCB. Appendix A contains copies of both sets of <br /> regulations. <br /> GSM.-md CH195 Page 7 of 31 July 14,1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />