File No. 20-1008-36 <br /> July 14, 1995 <br /> 6 CONSTRUCTION <br /> 6.1 TEST PAD <br /> The test pads were constructed in April, 1995. Results of the test pads and construction methods <br /> are presented in Appendix:E. <br /> 6.2 CONSTRUCTION OF THE FINAL COVER <br /> 6.2.1 Foundation Layer <br /> The foundation layer fill shall be on or off site materials meeting the requirements of Chapter 15 <br /> and shall be placed in lifts not exceeding 12 inches after compaction. The completed foundation <br /> layer shall be not less than 2-feet thick. Compaction of the lower foot shall be to the maximum <br /> practical based on optimum moisture content. The upper foot of the foundation layer shall be <br /> compacted to at least 90 percent of maximum dry density as defined by ASTM D 1557. Where <br /> the lower one foot of the foundation layer is already in place as temporary cover, it may be <br /> compacted in place to the maximum practical density. <br /> 6.2.2 Barrier Layer <br /> The low permeability barrier layer shall be constructed on a foundation layer that has been <br /> compacted to provide a uniform, firm surface. The low permeability barrier layer shall be <br /> constructed as follows: <br /> A. Import selected stockpile soil from Granite shall be placed on the finished foundation layer or <br /> a suitable mixing area. <br /> B. Import selected stockpile from Granite shall be spread over the finished foundation layer or a <br /> suitable mixing area in a single loose layer of approximately 13 inches. (The 13-inch thickness <br /> may be adjusted to allow for a final compacted barrier layer of 12 inches minimum). The lifts <br /> GSM.•md CH/95 Page 21 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />