File No. 20-1008-36 <br /> July 14, 1995 <br /> should be reduced to 11-1/2 inches of stockpile soils for the sideslope since it will contain 30 <br /> percent red clay. A 13-inch lift of stockpile soils should be used in conjunction with the 20 <br /> percent Ione clay. <br /> C. The 20 or 30 percent imported Granite red clay (by dry weight) shall be spread evenly over <br /> the respective uncompacted 13-inch or 11-1/2 inch loose lift. The 20 percent Ione clay (by <br /> dry weight) shall be spread evenly over the uncompacted 13-inch loose lift. This should give <br /> an uncompacted clay depth of approximately 3 inches for 20 percent red or Ione clay and <br /> approximately 4-1/2 inches for 30 percent red clay. <br /> As a guide for determining necessary quantities of clay (either red or Ione), a 25-foot by <br /> 50-foot square area will require approximately 54 and 76 tons for 20 and 30 percent, <br /> respectively. This figure is based on 20 to 22 percent moisture content for both clays, 125 <br /> pounds per cubic foot inplace dry density each, and a minimum 12-inches compacted <br /> thickness. Modifications to the spread rate may be necessary during construction <br /> depending on changes in these parameters. <br /> AWL The contractor shall not begin premixing until the Engineer has approved the spreading of red <br /> or Ione clay. <br /> D. A motorized pug mill mixer capable of injecting water into the mixing chamber at a <br /> controlled rate (CMIRS-500 Soil Stabilizer or approved equal) shall be used to initially <br /> break the 20 percent imported Ione clay clods only, if used as an alternate, and to mix the <br /> soil. The mixer shall have a minimum mixing depth of 16 inches and shall be equipped with <br /> "bullet" cutting teeth. The mixing chamber shall be set to a depth of approximately 4 <br /> inches, and the mixing bar shall rotate at a minimum speed of 160 rpm. A minimum of one <br /> pass (premixing) shall be made with the mixer without adding any moisture to break the 20 <br /> percent imported Ione clay clods. A CMI RS 500 Soil Stabilizer shall use a minimum of <br /> one premixing pass for Ione clay only. Premixing shall continue until a maximum of 10 <br /> percent is retained on a 3/4-inch sieve. Cobbles and cemented particles larger than 2 inches, <br /> and foreign material, shall be removed by the Contractor. Premixing is not necessary if <br /> Granite red clay is used. <br /> E. After premixing Ione clay, or when using Granite red clay, the mixing chamber shall be set <br /> to a depth adequate to mix the 13-inch stockpile soil layer with the 3-inch 20 percent <br /> Granite red or Ione clay layer or the 11-1/2-inch stockpile soil layer with the 4-1/2-inch 30 <br /> percent Granite red clay layer. Caution should be taken as not to mix the material with the <br /> foundation layer. A minimum of one pass shall be made with the mixer without adding any <br /> moisture to mix the 20 to 30 percent clay with the 80 or 70 percent stockpile soil, <br /> GSM.-md CH195 Page 22 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />