Laserfiche WebLink
File No. 20-1008-36 <br /> July 14, 1995 <br /> M. The location and frequency of field and laboratory testing shall be as set forth in Section <br /> 7.2 or as modified by the CQA monitor. <br /> N. Any materials which after placement and compaction do not meet design criteria shall be <br /> reworked or removed and replaced to meet specification. <br /> O. The compacted soil liner shall have a permeability of 1x10-6 cm/sec or less. <br /> P. During construction, finished sections of compacted barrier layer shall be sprinkled with <br /> water, as required to prevent drying and desiccation prior to application of the vegetative <br /> layer. The vegetative layer shall be placed as soon as possible after completion of <br /> permeability test results are approved by the Engineer and CQA officer. <br /> GSM.•md CH/95 Page 24 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />