My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:24:32 AM
Creation date
7/3/2020 11:04:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1996.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-1008-36 <br /> July 14, 1995 <br /> Idshk <br /> respectively. The mixing bar shall rotate at a minimum speed of 160 rpm. Moisture may be <br /> added for dust control, if needed. <br /> F. A minimum of one additional pass shall be made with the mixer, in which moisture shall be <br /> uniformly added by injecting water into the mixing chamber. The prepared mixture shall be <br /> brought to a moisture content of 2 percent above optimum prior to the start of compaction. <br /> Mixing shall continue until a minimum of 98 to 100 percent of the mixed material passes the <br /> 1-inch sieve, a minimum of 60 percent passes the No. 4 sieve, and the moisture content of <br /> the mixture is uniform. The Contractor shall not begin any compaction of the clay barrier <br /> layer until the Engineer approves the mixing of the layer. <br /> G. The clay barrier layer shall be compacted in a single lift. The lift shall be compacted to <br /> obtain a minimum relative compaction of 95 percent (ASTM D-1557) for areas which <br /> receive 20 percent red clay, 92 percent for areas which receive 20 percent Ione clay, and 90 <br /> percent for areas which receive 30 percent red clay. Compaction shall be performed using a <br /> Caterpillar 825C sheep's foot compactor or approved equal. Sideslopes shall be compacted <br /> to a minimum relative compaction of 92 percent for Ione or 90 percent for 30 percent red <br /> clay with a CAT D-8 dozer, or equivalent. The finished surface of the clay barrier layer <br /> shall not be below the grade established by the Engineer, nor shall it be more than 0.05-foot <br /> above the grade. The measurements shall be taken from the bottom of the sheep's foot or <br /> dozer indentions. <br /> H. Areas which are not accessible to heavy construction equipment shall contain 30 percent <br /> import Granite red clay and 70 percent selected stockpile soil or 20 percent Ione clay and <br /> 80 percent selected stockpile soil for the clay barrier layer. These areas are also required to <br /> meet all specifications as contained herein, except that the soils shall be mixed at a <br /> convenient location. These areas shall be compacted by any method approved by the <br /> Engineer which will produce a minimum relative compaction of 92 percent for the Ione clay <br /> and 90 percent for the 30 percent red clay. <br /> I. Side slopes shall be compacted using a D-8 dozer or equal to obtain a minimum 92 <br /> percent relative compaction for Ione clay or 90 percent for 30 percent red clay. <br /> J. The barrier layer is to be constructed in a single-lift process. <br /> K. The lift shall be thoroughly compacted and satisfy moisture/density and permeability <br /> controls before a subsequent layer is placed. <br /> L. The daily work area shall extend a distance no greater than permits the maintenance of <br /> moist-soil conditions and construction operations. Desiccation and crusting of the lift <br /> surface shall be avoided as much as possible. <br /> GSM.-md CH/95 Page 23 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.