My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:24:32 AM
Creation date
7/3/2020 11:04:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1996.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-1008-36 <br /> July 14, 1995 <br /> 7 QA/QC TESTING AND MONITORING <br /> 7.1 GENERAL <br /> The construction monitoring and QA/QC testing of the foundation layer will be primarily <br /> performed by the SJDPW Engineer and Field Engineers. Kleinfelder will assist with this <br /> monitoring. KMeinfelder will perform all monitoring and QA/QC testing of the barrier layer of the <br /> final cover. This will include full-time monitoring of barrier layer construction since the SJDPW <br /> will hire an outside earthwork contractor to construct the barrier layer. This workplan is based on <br /> the estimate that an earth work contractor will require approximately 1-1/2 months to complete <br /> the barrier layer. <br /> 7.2 QA/QC TESTING <br /> Table 7-1 shows the construction monitoring test methods. This table outlines the construction <br /> observations in detail and indicates the elements to be observed. For the most part they are <br /> standard ASTM tests as shown. The Sealed Double Ring Infiltrometer(SDRI)test will be carried <br /> out using a circular KMeinfelder modification of the Trautwein square SDRI. <br /> Table 7-2 shows the frequency of laboratory testing for the red clay borrow material. <br /> Table 7-3 shows the frequency of field and laboratory testing and observations for the previously- <br /> performed test pads. <br /> Table 7-4a shows the frequency of field and laboratory testing and observation for the initial 10 <br /> percent of the final cover. <br /> Table 7-4b shows the frequency of field and laboratory testing and observations for the remainder <br /> of the final cover(assuming favorable initial test results). <br /> GSM.•md CII/95 Page 26 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.