Laserfiche WebLink
File No. 20-1008-36 <br /> July 14, 1995 <br /> Table 7-5 shows the pass/fail criteria for soil properties including moisture, density, percent <br /> passing#200 sieve, and permeability. <br /> 7.3 CONSTRUCTION MONITORING <br /> Kleinfelder personnel will visit the site on each day that construction is in progress. The number <br /> of hours that Kleinfelder staff spend at the site each day will be determined by the rate of <br /> progress of the construction work. The Kleinfelder QA/QC technician will perform the necessary <br /> geotechnical tests or tasks in accordance with the Frequency of Testing schedule as set forth on <br /> Tables 7-4a, and 7-4b. Kleinfelder, Inc. previously performed CQA testing of the test pads with <br /> the Frequency of Testing schedule as set forth on Table 7-3. Test results and observations will be <br /> recorded on standard forms. An outline of Kleinfelder Standard Forms is given in Appendix C. <br /> A weekly report will be prepared which will summarize the results of testing for the previous <br /> week. This summary report will be prepared by the supervising technician or engineer and <br /> reviewed by the QA/QC officer. <br /> GSM.°md CH/95 Page 27 of 31 July 14, 1995 <br /> 20-1008-36(CQACOR) Copyright 1995,Kleinfelder,Inc. <br />