Laserfiche WebLink
B. Work requiring EHD inspection may be done between 9:00 AM and 4:00 PM. <br />Contractor shall coordinate all inspections with EHD inspector. <br />IV. Work Locations <br />A. Work may be at any of the following locations during the working hours indicated: <br />• Foothill Sanitary Landfill <br />6484 N Waverly Road Linden, California <br />Work hours: 8:OOAM to 5:OOPM <br />• North County Recycling Center and Sanitary Landfill <br />17720 E. Harney Lane, Lodi, California. <br />Work hours: 7:OOAM to 4:OOPM <br />• Harney Lane Sanitary Landfill (Closed Landfill) <br />14750 E. Harney Lane, Lodi, California <br />Work hours: 8:OOAM to 5:OOPM <br />• Corral Hollow Sanitary Landfill (Closed Landfill) <br />31130 South Corral Hollow Road <br />Near Tracy, California <br />Work hours: 8:OOAM to 5:OOPM <br />B. Work Hours <br />1. Contractor's personnel may be on site and performing work on scheduled working <br />days during site work hours. <br />C. Work Schedule <br />1. A written notice for the start of work will be sent to the Contractor by the County <br />identifying the scope of work. <br />2. County and Contractor will mutually schedule maintenance work start date. <br />3. Work completion time will also be mutually agreed. Contractor shall complete <br />work within the agreed time. Deliberate delay and poor performance in completing <br />work may result in contract cancellation. <br />D. Site Conditions <br />1. Verification of Conditions <br />Contractor shall verify existing conditions before commencing work. <br />Discrepancies between the bid items and field conditions shall be immediately <br />reported to the Engineer who shall determine if there needs to be a change <br />order. Contractor's failure to call discrepancies to the Engineer's attention <br />constitutes acceptance of those conditions. <br />On -Call LFG System Maintenance Contractor 2 <br />San Joaquin County Purchasing Department <br />