Laserfiche WebLink
�s y <br />I. General <br />• No partial payments will be made. <br />• Measurement for payment shall be in the presence of the Engineer. <br />• Payment for work will be made after acceptance of work by the County. <br />A. Inclusiveness of Payment <br />Payment for shall be for work as shown on the construction drawings and as specified <br />herein. Payment shall be full compensation for labor, materials, equipment, and <br />overhead including insurance, and permits and coordination with EHD as needed. <br />B. Unit prices <br />Unit prices shall be applicable throughout the Contract period. <br />Proposal for increase in unit prices for any bid line item or work after award of contract <br />due to factors beyond the control of the Contractor shall be submitted to the Engineer for <br />review with adequate data to support proposed increase. The County reserves the right <br />to reject proposals for unit price increase. <br />A. Mobilization and Demobilization (Any Listed Site) <br />Mobilization and Demobilization will be paid at the lump sum price per mobilization, <br />according to the site to which the Contractor mobilizes, as identified in the Bid Sheet. <br />1. Mobilization includes: <br />a. Obtaining a drilling permit from the San Joaquin County Environmental Health <br />Department (Solid Waste Unit), and providing a copy of that permit to the <br />Engineer. <br />b. Obtaining approval of a Health and Safety Plan from the EHD <br />c. Coordinating required inspections with EHD. <br />d. Delivery to the work site all necessary equipment, tools, materials and <br />supplies in good working order. <br />e. Providing crew chiefs with contract documents. <br />On -Call LFG System Maintenance Contractor 11 <br />San Joaquin County Purchasing Department <br />