My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:41:31 PM
Creation date
7/3/2020 11:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Abandoned boreholes in soil: place cement slurry. The cement slurry seal shall <br />consist of a mixture of Portland cement with not more than seven gallons of clean <br />water per 94 -pound sack (one cubic foot) of cement. <br />IV. Trench Beneath Closure Barrier <br />A. Restoring the barrier layer to the acceptance of regulatory agencies is of the essence. <br />Place powdered bentonite and GCL as shown. <br />B. Contractor shall place GCL and associated barrier materials in the presence of the <br />Engineer and EHD staff. Call for inspection of barrier replacement a minimum 24 <br />hours prior to placement. <br />V. Additional Work <br />A. Preparation of the site for drill rig access and set-up may require additional work by <br />the Contractor. The scope of this additional work will be determined by the Engineer <br />in consultation with the Contractor. <br />B. Submit proposal for additional work as requested by the Engineer. Proceed after <br />approval of that proposal. <br />On- Call LFG System Maintenance Contractor 10 <br />Sar Joaquin County Purchasing Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.