grout has settled, the ground surface will be restored to original grade using hand tools and <br />surrounding soils to minimize depressions in the ground surface. <br />3.44 MONITORING WELL INSTALLATION <br />Permanent monitoring wells will be constructed when the results of the VOC analyses from <br />the HydropunchT"' samples indicate non-detectable concentrations. <br />3.4.1 Borehole Reaming and Soil Sampling <br />At each site where the HydropunchTM sample indicates non-detectable VOC concentrations, <br />the sampler and casing will be removed, and the borehole will be reamed in preparation for <br />well construction. Boreholes will be reamed to 10 inches using hollow -stem auger <br />methods. Once the ream advances to the original depth of the exploratory borehole, <br />drilling will continue up to 20 feet, and soil samples will be collected continuously using <br />split -spoon sampling and logging methods described above. All drilling operations will be <br />continuously observed, and samples will be retained for geologic logging purposes. <br />3.4.2 Monitoring Well Construction <br />Groundwater monitoring wells will be constructed using 2 -inch nominal inner diameter, <br />Schedule 80 PVC blank casing and 20 feet of screen to the approximate depths indicated <br />above. Well screens will be formed using machine cut 0.020 -inch slots. A one -inch nominal <br />inner diameter sounding tube constructed of similar PVC casing and screen will also be <br />installed to avoid future conflict between tubes and wires associated with the pump. All <br />well materials, including blank and factory -slotted casing, will be virgin, decontaminated <br />and factory sealed. All well materials will be covered in plastic or similar protective <br />materials when delivered to the site and will remain so until used in construction. <br />All well casing will be flush -threaded, including the bottom cap at the base of the wells. No <br />glue or solvents will be used to join the sections. Because wells will be constructed through <br />the hollow -stem of the auger, centralizers are not needed. The drillers will suspend the <br />casing from the drill wire during construction to ensure that the casing remains centralized <br />within the augers. <br />Based on the grain size distribution of the shallow, perched aquifer encountered in past site <br />investigations, the proposed filter pack material will consist of commercially available inert, <br />washed and graded number 2/12 Monterey sand (or equivalent). Well filter packing will be <br />' accomplished by slowly pouring the sand down the auger flights, which act as a tremie pipe. <br />As sand is introduced, the augers will be withdrawn to allow the sand to fill the annular <br />spaced between the auger and borehole wall. The elevation of the sand will be measured <br />periodically using a decontaminated weight to ensure that no bridging occurs. The filter <br />pack installation will be deemed complete when the sand extends at least three feet above <br />' 9 <br />2011-0115 CHSL EMP Workplan Geo -Logic Associates <br />Revision 1- August 24, 2011 <br />