Laserfiche WebLink
u <br />0 <br />7 <br />J <br />I <br />SECTION 01630 <br />1.01 SUMMARY <br />A. This section supplements the requirements specified in the Specifications. If the <br />requirements of this section and conditions noted above conflict, the Contractor <br />shall adhere to the more stringent requirement as determined by the Engineer. <br />B. Section includes procedures for submission of requests for substitutions of products. <br />1 1.02 DEFINITIONS <br />C <br />ri <br />0 <br />7 <br />L <br />[7 <br />A. Refer to Section 01075 —Technical Specification Definitions. <br />1.03 RELATED SECTIONS <br />A. Specifications <br />A. The Contractor shall submit to the Engineer for review a complete list of all <br />materials and equipment, which differ in any respect from materials, and equipment <br />specified in these Technical Specifications or on the Construction Drawings. <br />Include with this list all materials which are proposed by subcontractors for use in <br />the Work of this Contract and also materials which are not specifically mentioned in <br />the Technical Specifications. <br />B. Whenever the name, brand, or model of a manufacturer's article, product, item of <br />equipment, or system is specified, it is used as a measure of quality and utility, or as <br />standard. No intent to limit competition is inferred or implied. Where more than <br />one manufacturer's name is specified, the first named manufacturer is the basis of <br />design. Second, third, and subsequent named manufacturers shall be considered <br />substitutions, but requests for their substitutions are not required. <br />C. If the Contractor desires to use any other brand or manufacture of equivalent <br />quality, appearance, and utility to the product specified, the Contractor shall submit <br />the proposed substitution. The Engineer will accept as satisfactory or reject the <br />request for substitution, and the Engineer's decision shall be final. Unless <br />SHAW ENV/RONMENTAL, INC, <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj jechnical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Product Options and Substitutions <br />1 01630-1 <br />