My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />u <br />fl <br />0 <br />0 <br />I I <br />11 <br />0 <br />r_, <br />G' <br />G. If a proposed substitution requires changes in related work, which, in the opinion of <br />the Engineer, constitute a deviation from Contract requirements or aspects of <br />design, it may be rejected. <br />H. Contractor shall be responsible for the execution of any changes in other parts of his <br />own work or the work of subcontractors or other contractors, caused by a <br />substitution proposed by the Contractor, at no additional cost to the County. <br />I. Contractor shall not proceed with any substitution until the Engineer has accepted <br />the substitution as satisfactory, in writing. Such acceptance shall not relieve the <br />Contractor from complying with the requirements of the Construction Drawings and <br />Specifications. <br />J. Failure to propose the substitution of any product a minimum of fourteen (14) <br />calendar days in advance of the proposed installation may be deemed sufficient <br />cause for the denial of the request for substitution. <br />K. Any substitutions submitted to the Engineer which do not comply with the above <br />requirements will be returned to the Contractor without the Engineer's review. <br />L. Originally specified items shall be furnished, unless a request for substitution is <br />submitted and accepted in accordance with the foregoing requirements. <br />PART2-PRODUCTS <br />Not Used <br />PART 3 - EXECUTION <br />Not Used <br />PART 4 - MEASUREMENT AND PAYMENT <br />4.01 MEASUREMENT <br />A. Separate measurement for payment will not be made for work or materials specified <br />in this Section. <br />4.02 PAYMENT <br />A. Separate payment will not be made for work or materials specified in this Section. <br />Full compensation shall be considered as included in the prices paid for the various <br />SHAW ENVIRONMENTAL, INC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj_Technical Specs -4-19-12 Rev 1.DocRev. 0, 04/05/2012 <br />Product Options and Substitutions <br />01630-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.