My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4.6 Project Records <br /> Various other project record forms are coinpleted as needed. The use of project record forms is <br /> limited to the purpose(s) for which they are intended. Persons preparing project record forms <br /> shall complete them by filling in the blanks provided, and shall sign and date each project record <br /> form. The originals of project record forms shall be submitted to the CQA Monitor, who shall <br /> copy and distribute them as appropriate and file and maintain them as Project Documents. <br /> 2.5 Documentation and Control of Nonconformances <br /> Any item, activity, work product, or Project Document that does not conform to the requirements <br /> of the Contract Documents or applicable laws and regulations is handled as a nonconformance. <br /> Major goals of the CQA program are to minimize the number and severity of nonconformances, <br /> to resolve nonconformances as quickly, efficiently, and economically as is practical, and to <br /> prevent nonconformances from adversely affecting the quality or performance of the completed <br /> project. <br /> 2.5.9 Observation of Nonconformances <br /> All parties involved in the Extension of the Closure Cap of the CHLF have a responsibility to <br /> identify and report nonconformances. If a suspected nonconformance is discovered or observed <br /> during construction or in the product, job-related materials, documentation, or elsewhere, the <br /> person discovering or observing the suspected nonconformance will promptly report it to the <br /> CQA Monitor. The CQA Monitor will investigate the report and, if it is credible, notify the CQA <br /> Engineer and the Resident Engineer as soon as it is practical to do so. The Resident Engineer will <br /> then notify contractor. The Resident Engineer will designate CQA Monitor the authority to stop <br /> contractor's work if non conformance work area <br /> 2.5.2 Determining Extent of Nonconformances <br /> ' Whenever a nonconformance is discovered or observed in the construction process, product,job- <br /> related materials, documentation, or elsewhere, the CQA Monitor will determine the extent of <br /> the nonconformance. The extent of the deficiency may be delineated by additional sampling, <br /> testing, observations,review of records, or other means, as appropriate. <br /> 2.5.3 Documenting Nonconformances <br /> Nonconformances shall be documented in writing on the Daily Report, other logs or reports, and <br /> elsewhere, as appropriate. Documentation must occur immediately upon determining the extent <br /> ' of the nonconformance. For those nonconformances that are serious or complex in nature, or that <br /> require engineering evaluation, the CQA Monitor shall issue a Nonconformance Report to the <br /> CQA Engineer, Resident Engineer, Contractor, and County within one working day after the <br /> extent of the nonconformance has been investigated. <br /> CH CQA Plan 041712 Rev2a.doc 2-6 Construction Quality Assurance Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.