My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 Construction Quality Assurance for Earthwork <br /> This section describes the monitoring and testing that will be performed to assure that earthwork <br /> construction meets the specified requirements. The scope of earthwork construction for this project <br /> includes the following (not necessarily listed in sequential order of construction): <br /> ® Placement and compaction of general fill <br /> ® Preparation of the subgrade at the base of the final cover <br /> ® Placement of the vegetative soil layer of the final cover <br /> ® Placement of riprap for erosion control along drainage channels and swales <br /> The goal of the CQA program for earthwork is to assure that proper construction techniques and <br /> procedures are used and that the completed earthwork conforms to the Contract Documents. To <br /> accomplish this goal, the CQA program includes review of the Contractor's quality control submittals, <br /> material evaluation, construction testing, and construction observation. Another goal of the CQA <br /> program is to identify problems that could occur during construction and to verify that those problems <br /> are avoided or corrected before construction is completed. <br /> .7 Material Evaluation Testing <br /> Material evaluation testing is required for all borrow source before construction begins. Section <br /> 02200 Site Earthwork of the Construction Specifications for this project provide the specific "Source <br /> Quality Control" generally described in this section of the CQA Plan. <br /> ' The Construction Specifications give descriptions and requirements for the required soil and rock <br /> materials. Test samples will be obtained in accordance with standard operating procedures and <br /> applicable ASTM or Caltrans standards. Archive samples and test results will be maintained and <br /> ' stored at the project site. <br /> The individual project construction specifications list the required tests, number of samples, and <br /> frequencies of testing for the soil and rock materials expected to be used for Extension of Closure Cap <br /> of the CHLF. These tests are also summarized in Table 4-1 at the end of this section. <br /> 4.9.1 Materials Submittals <br /> The Resident Engineer will accept material submittals to establish the acceptability of soil and rock <br /> materials and then forward to CQA Engineer for review and acceptance. The Contractor will make <br /> materials submittals to the Resident Engineer whenever the Contract Documents require them. <br /> Review and acceptance of materials submittals are the responsibility of the CQA Engineer. <br /> CH CQA Plan 041712 Revb.doc 4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.