Laserfiche WebLink
STANDARD OBSERVATIONS <br /> Site inspections were performed monthly during the quarter(Appendix H). An electronic <br /> signature on the form certifies that the observations were performed and are accurate. <br /> RUN-ON AND -OFF SITE COMPONENTS OR CONTROL MEASURES <br /> CHSL utilizes several site components or methods to remediate (with control measures)the <br /> surface water run-on and run-off. A road at the perimeter of the site assists in preventing run-on. <br /> A mid-slope berm around the unit directs surface water run-off into the retention pond in the <br /> northwest comer of the site. Perimeter ditches, at the base of the unit, direct run-off into the <br /> retention pond in the south-east corner of the site. During the first quarter,there were no <br /> breeches in the run-on and run-off control measures. Monitoring will continue in accordance <br /> with the Stormwater Pollution Prevention Plan. <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> t <br /> 1 <br /> 1 <br /> Corral Hollow Sanitary Landfill 14 Department of Public Works/Solid Waste <br /> 1 s'Quarter 2012 Groundwater Monitoring County of San Joaquin—April 16,2012 <br />