Laserfiche WebLink
cases and shipped to a California-certified analytical laboratory for analysis. All vessels will be <br /> documented in the field and transported to the laboratory in accordance with EPA Chain-of- <br /> Custody protocol. Samples will be analyzed for fixed gases in accordance with ASTM method <br /> D-1946 and for VOCs in accordance with EPA method TO-14. <br /> All soil gas sampling will follow CHSL Specification Section 02670 contained in Appendix A. <br /> 2.3 Task 3- Evaluation Monitoring Report <br /> An Evaluation Monitoring report will be prepared after the field activities are completed. The <br /> report will include the following: <br /> • A discussion of drilling methods implemented in the installation of well MW-8 and the <br /> soil borings. <br /> • A discussion of the geologic conditions encountered in the installation of well MW-8 <br /> and the soil borings. <br /> • Geologic cross sections that present the subsurface conditions. <br /> • Exploratory boring logs, well construction details, monitoring well development <br /> sheets, and the Department of Water Resource forms. <br /> • A presentation and discussion of the analytical results of the investigation. <br /> • A site map illustrating the new well location, the hydropunch boring location and the <br /> soil gas soil boring locations. <br /> The report will be prepared under the direct supervision of a California-professional geologist. <br /> Corral Hollow EMP WP.DOC 2-6 February 28,2007 <br />