Laserfiche WebLink
Page 2 of 2 <br /> To: Natalia Subbotnikova [EH] <br /> Cc: Michael Carroll;jfreedman@SCSEngineers.com; Tony Jaramillo; Robert McClellon [EH] <br /> Subject: GW-1A WEII Inst @ Corral Hollow Landfill <br /> Hello Natalia <br /> Solid Waste Division has planned to install Soil Gas Monitoring Well, GW-1A at Corral Hollow <br /> Landfill on April 10th and 11th 2008. Attached is the revised Work/Health And Safety Plan <br /> with the new well design drawings and specifications. The new well design was submitted to Robert <br /> and Geno Yetka (CIWMB)for review. <br /> The well installation permit issued SR#0052532 will be used for this project. <br /> We are intending to start drilling on April 10th around 8.00am. The driller will be ready for well <br /> completion inspection around 11.00am on the 11th <br /> The drilling Contractor for this Project is Cascade Drilling. Job Foreman is Paul. (916)638-1169. <br /> Installation of the new well will be logged by SCS Engineers—John Freedman (925)426-0080. <br /> Please let me know if you need any additional information. <br /> Thanks <br /> Joyesh J Chandra <br /> San Joaquin County <br /> Department Of Public Works <br /> Solid Waste Division <br /> PH-(209) 468-3066 <br /> FAX-(209)468-3078 <br /> jchandra o sj aov.org <br /> 4/7/2008 <br />