Laserfiche WebLink
Page I of 2 <br /> Natalia Subbotnikova [EH] <br /> From: Yekta, Gino [GYekta@CIWMB.ca.gov] <br /> Sent: Monday, April 07, 2008 4:06 PM <br /> To: Natalia Subbotnikova [EH] <br /> Subject: RE: GW-1A WEII Inst @ Corral Hollow Landfill <br /> Hello Natalia: Thank you for the information. In that case, I may stop by on the I I th,though not sure <br /> yet since I might have to attend a meeting here. Thank you for the heads up...................Gino <br /> From: Natalia Subbotnikova [EH] [mailto:nsubbotnikova@sjcehd.com] <br /> Sent: Monday, April 07, 2008 3:11 PM <br /> To: Yekta, Gino <br /> Subject: FW: GW-1A WEII Inst @ Corral Hollow Landfill <br /> Hello Gino, <br /> Robert told me that you may stop by at the Corral Hollow Landfill during installation of GW-1A. <br /> Just want to let you know that on April 10th there will be the only drilling activities on site. Starting on April 11th <br /> around 1 lam Public Works are planning to start the actual well installation. <br /> I will be on site on April 11th during the whole day until they have finished all work. <br /> Please let me know if you need any additional information. <br /> Thanks.............. Natalia <br /> From: Joyesh Chandra [mailto:Jchandra@sjgov.org] <br /> Sent: Thursday, April 03, 2008 3:10 PM <br /> To: Natalia Subbotnikova [EH] <br /> Cc: Michael Carroll;jfreedman@SCSEngineers.com; Tony Jaramillo; Robert McClellon [EH] <br /> Subject: GW-1A WEII Inst @ Corral Hollow Landfill <br /> Hello Natalia <br /> Solid Waste Division has planned to install Soil Gas Monitoring Well, GW AA at Corral Hollow Landfill on April <br /> 10th and 11th 2008. Attached is the revised Work/Health And Safety Plan with the new well design drawings <br /> and specifications. The new well design was submitted to Robert and Geno Yetka (CIWMB)for review. <br /> The well installation permit issued SR#0052532 will be used for this project. <br /> We are intending to start drilling on April 10th around 8.00am. The driller will be ready for well completion <br /> inspection around 11.00am on the 11th <br /> The drilling Contractor for this Project is Cascade Drilling. Job Foreman is Paul. (916)638-1169. <br /> 4/7/2008 <br />